|
|
Prototype (7900101), built at Irkutsk, flew 16 December 1957, with Kuznetsov NK-4 turboprops, as
rear-loading development of An-10 airliner; more than 900 built with AI-20K engines for military and civil
use, ending in USSR in 1973; An-12BP ("Cub") was standard
medium-range paratroop and cargo transport of Soviet Military Transport Aviation (VTA) from 1959;
replacement with Il-76 began 1974, but about 170 remain in air force service, plus at least 25
An-12BK/PP/PPS "Cub-A/B/C/D" electronic warfare conversions in air forces and Naval Aviation. More than
100 (of 183 originally exported) are used by nine other air forces; further 190 flown by some 70 freight
airlines. Shaanxi Aircraft Company, China, manufactures redesigned Yunshuji-8 (Y-8) transport version and
derivatives.
| CREW | 6 |
| PASSENGERS | 130 |
| ENGINE | 4 x turbo-prop AI-20, 3125 kW |
| WEIGHTS |
| Take-off weight | 54000-61000 kg | 119050 - 134483 lb |
| Empty weight | 30500 kg | 67241 lb |
| DIMENSIONS |
| Wingspan | 38.0 m | 124 ft 8 in |
| Length | 37.0 m | 121 ft 5 in |
| Height | 9.8 m | 32 ft 2 in |
| Wing area | 121.7 m2 | 1309.97 sq ft |
| PERFORMANCE |
| Max. speed | 640 km/h | 398 mph |
| Cruise speed | 600 km/h | 373 mph |
| Ceiling | 10000 m | 32800 ft |
| Range | 5500 km | 3418 miles |
| ARMAMENT | 2 x 23mm machine-guns |
| hernowo, hernowo_st(@)yahoo.com, 27.11.2008 i need to know about : 1. runway length requirement in ARFL condition? 2. main landing gear dimension? I need it to design the airside. thank you | | vic sulit, vic(@)saharaaviation.com, 11.10.2008 Please provide me the basic operating cost of AN12, like how much do we need to allot for maintenance (schedule and unchedule)per flying hour. also kindly include the estimated cost for pilot and crew training (transition and recurrency) | | Nabil Alaeddin, alaeddin_nabil(@)msn.com, 14.06.2007 I need to know about the specification or requirements of ( Tie-downs or they call it Mooring points) Tank you |
|
Do you have any comments about this aircraft ?
|
| |